top of page
Isaan SwimmingPool – Expert Pool Construction and Maintenance Across 20 Provinces

Start new swimming pool in Korat

Introduction:

Today marks an exciting start for us at Sakon Swimming Pool as we begin our project in Korat. We are eager to create a beautiful swimming pool for the community, but our first day has come with its share of challenges.


Chapter 1: A Rough Start

We began the day with optimism, but our rented excavator and truck didn’t show up as expected, and our calls to the rental company went unanswered. After some frustrating hours, we managed to get help, but the person who arrived didn’t have a driver. So, I took it upon myself to climb into the excavator and drive it. It was an unexpected twist, but I was determined to keep things moving.



Chapter 2: Facing Challenges

On top of that, a persistent water leak in the village had left the ground soft, which caused our truck to get stuck repeatedly. Each time, we had to find a way to pull it free. It was a reminder that construction can be unpredictable, but we are committed to pushing through.


Chapter 3: Our Vision Takes Shape

Despite the setbacks, we’re excited about our pool design. It will be 11.5 meters long and 5 meters wide, featuring an infinity edge and a jacuzzi. We’ve chosen a lovely sky blue tile, and we can already picture how stunning it will look once completed.


Conclusion: Looking Ahead

Today has been tough, but it has also strengthened our resolve to succeed. As we finish our first day, we are hopeful that tomorrow will bring smoother progress. At Sakon Swimming Pool, we believe that with hard work and determination, we can turn our vision into a reality for everyone to enjoy.

Comments


bottom of page